Licensed lead · not independently verified · dcd-dir-000343

Creekstone Energy Delta Gigasite

reported under construction

Creekstone Energy

Delta · Millard County · Utah

Planned 10,000 MWSource updated 1 September 2026exact location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Creekstone Energy
Address and locality
Delta · Millard County · Utah
Lifecycle status
reported under construction
Facility type
data center
Reported capacity
Planned: 10,000 MW (source-reported; boundary not independently verified)
Source freshness
1 September 2026
Location precision
exact
Source confidence
reported
Stable directory ID
dcd-dir-000343

What the source record says

Claims to be world's largest planned AI data center campus at 20M sq ft. 1,143 acres owned; 13,000-acre SITLA lease for solar (largest solar lease in Utah history — record previously stated 30,000 acres, corrected to 13,000 acres per March 2026 BusinessWire announcement and multiple independent sources). Initial customer BluSky AI allocated up to 50MW. Adjacent to Intermountain Power Project. 10GW is full-buildout target; first 300MW gas delivery H1 2027. Coordinates at Delta city centroid; site is southeast of Delta.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-06 · reported proposed

    Creekstone announced Delta Gigasite; committed $17B to Millard County project; Series B funding closed led by Trident Ridge

  2. 2025-12 · reported under construction

    Broke ground December 2025 on Delta site; first 300MW gas-fired power delivery targeted H1 2027; permits issued

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID creekstone-delta-ut. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →