Licensed lead · not independently verified · dcd-dir-001419

T5@Silicon Valley

reported operational

T5 Data Centers

39800 Eureka Drive · Newark · Alameda County · California · 94560

Planned 49.1 MWOperational 17 MWSource updated 2 August 2026approximate location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
T5 Data Centers
Address and locality
39800 Eureka Drive · Newark · Alameda County · California · 94560
Lifecycle status
reported operational
Facility type
data center
Reported capacity
Operational: 17 MW; Planned: 49.1 MW (source-reported; boundary not independently verified)
Source freshness
2 August 2026
Location precision
approximate
Source confidence
reported
Stable directory ID
dcd-dir-001419

What the source record says

Operator corrected to T5 Data Centers, not Serverfarm: Serverfarm's own current locations page does not list a Newark/Silicon Valley property, and Serverfarm has acquired only one T5 property to date (El Segundo/LAX1, already tracked separately as serverfarm-lax1-el-segundo-ca) - not a company-wide rebrand. T5 Data Centers remains an active, independent company. The existing 128,000 SF/17MW building (built 2002 per county assessor record) was sold by Apple to T5 in an Aug 2020 ($30M) deed transfer, announced by T5 Oct 6 2020 alongside a disclosed plan to add 32.1MW/180,000 SF (49.1MW total target); no source confirms whether that expansion has completed. The $30M figure is a real-estate acquisition price for the existing building only, not development capex, so it is not recorded as investmentUsd. Apple as tenant is corroborated by secondary sources (an aggregator listing and a contractor's own portfolio page naming Apple independently) but not by a primary T5/Apple source, which refers only to 'a Fortune 100 enterprise' - flagged reported, not primary-confirmed. No AI/HPC/GPU-specific marketing found, so aiClassification is omitted. T5 markets this campus as 'Silicon Valley,' but Newark is geographically East Bay/Alameda County, not South Bay/Santa Clara County. Coordinates are a best-effort approximate estimate for the disclosed street address, not an independently geocoded parcel point - recommend a follow-up pass with a mapping source to confirm precisely.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2020-10-06 · reported operational

    T5 Data Centers announced acquisition of the existing, already-operational 128,000 SF / 17MW building from a Fortune 100 enterprise (identified as a former Apple facility by secondary sources — see notes), plus a planned 32.1MW/180,000 SF expansion (49.1MW total target).

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID t5-silicon-valley-newark-ca. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →