T5 @ Atlanta IV

reported proposed

T5 Data Centers

Palmetto · Fulton County · Georgia

Planned 300 MWSource updated 10 September 2026exact location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
T5 Data Centers
Address and locality
Palmetto · Fulton County · Georgia
Lifecycle status
reported proposed
Facility type
data center
Reported capacity
Planned: 300 MW (source-reported; boundary not independently verified)
Source freshness
10 September 2026
Location precision
exact
Source confidence
reported
Stable directory ID
dcd-dir-001411

What the source record says

City discrepancy: the ledger cited Fairburn, but T5's own page and PR Newswire list Palmetto, GA; DCD describes it as Fairburn/Fulton County with a 91-acre site in Palmetto - site is on the Fairburn/Palmetto border in South Fulton County (I-85 and Gullatt Rd). Capacity: T5's page lists '200 MW available' (Phase 1) while the Aug 2024 land-acquisition PR cites '300 MW' campus total - 300 MW recorded as planned. No tenant disclosed (T5 is a wholesale/build-to-suit developer targeting hyperscalers; page cites AI/liquid-cooling suitability). Phase 1 construction targeted Q2 2027; on-site substation expected 2026. No investment or jobs figure disclosed. Coordinates approximate (I-85/Gullatt Rd corridor).

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2024-08-28 · reported proposed

    Land acquisition finalized; 91-acre site already zoned for data-center use; use permit still required

    Open cited source →

  2. 2025-05-23 · reported proposed

    T5 refiled modified plans: 1.32M sq ft, 3 buildings, up to 300 MW; the original June 2024 filing (495K sq ft, 2 buildings) was withdrawn

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID t5-atlanta-iv-palmetto-ga. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →