This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- Soluna Holdings
- Address and locality
- Raymondville · Willacy County · Texas
- Lifecycle status
- reported under construction
- Facility type
- data center
- Reported capacity
- Planned: 166 MW (source-reported; boundary not independently verified)
- Source freshness
- 23 July 2026
- Location precision
- exact
- Source confidence
- confirmed
- Stable directory ID
dcd-dir-001334
What the source record says
Rio Grande Valley, Willacy County; 166 MW clean computing in two phases (scaling toward 300+ MW — in notes), ERCOT-approved, Phase 1 live early 2026. Coordinates are anchored to Raymondville (county seat); the exact parcel is unspecified.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025-09 · reported under construction
Soluna broke ground on Project Kati (its largest site) in the Rio Grande Valley, Willacy County; 166 MW in two phases, Phase 1 live early 2026
Sources and attribution
- Soluna Breaks Ground on its Largest Site to Date, Project Kati · Soluna Holdings
- HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage) · Oak Ridge National Laboratory (ORNL) / HIFLD
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID soluna-project-kati-willacy-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.