Licensed lead · not independently verified · dcd-dir-001333

Soluna Project Grace

reported under construction

Soluna Holdings

Silverton · Briscoe County · Texas

Planned 2 MWSource updated 3 August 2026approximate location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Soluna Holdings
Address and locality
Silverton · Briscoe County · Texas
Lifecycle status
reported under construction
Facility type
data center
Reported capacity
Planned: 2 MW (source-reported; boundary not independently verified)
Source freshness
3 August 2026
Location precision
approximate
Source confidence
reported
Stable directory ID
dcd-dir-001333
Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-01-08 · reported under construction

    Siemens MOU announced Jan 8 2026 for a 2 MW behind-the-meter power-and-controls pilot to validate managing rapid GPU-driven power swings for AI/HPC workloads at the Project Grace site. Soluna's own project tracker lists Grace as 'Under Construction.'

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID soluna-project-grace-silverton-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →