This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- Soluna Holdings
- Address and locality
- Silverton · Briscoe County · Texas
- Lifecycle status
- reported under construction
- Facility type
- data center
- Reported capacity
- Planned: 2 MW (source-reported; boundary not independently verified)
- Source freshness
- 3 August 2026
- Location precision
- approximate
- Source confidence
- reported
- Stable directory ID
dcd-dir-001333
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026-01-08 · reported under construction
Siemens MOU announced Jan 8 2026 for a 2 MW behind-the-meter power-and-controls pilot to validate managing rapid GPU-driven power swings for AI/HPC workloads at the Project Grace site. Soluna's own project tracker lists Grace as 'Under Construction.'
Sources and attribution
- Soluna and Siemens Collaborate to Solve GPU Power Swings in Behind-the-Meter AI · Soluna Computing
- Soluna: Project Grace Data Center · Baxtel
- Data Centers — Soluna Computing (project tracker) · Soluna Computing
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID soluna-project-grace-silverton-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.