This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- Soluna Holdings
- Address and locality
- Rio Hondo · Cameron County · Texas
- Lifecycle status
- reported proposed
- Facility type
- data center
- Reported capacity
- Planned: 100 MW (source-reported; boundary not independently verified)
- Source freshness
- 3 August 2026
- Location precision
- approximate
- Source confidence
- reported
- Stable directory ID
dcd-dir-001331
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025-04-17 · reported proposed
Term sheet for power signed April 2025; PPA, land, and ERCOT interconnection agreements still in progress per baxtel (year planned 2026).
Sources and attribution
- Soluna to Expand Renewable-Powered AI & Bitcoin Computing With New 100MW Site · Soluna Computing
- Soluna: Project Ellen Data Center · Baxtel
- Palmas Wind, LLC plant record · GridInfo
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID soluna-project-ellen-rio-hondo-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.