Licensed lead · not independently verified · dcd-dir-001305

Sentinel Grove Technology Park (Project Jarvis)

reported cancelled

Undisclosed developer (marketed as 'Sentinel Grove Technology Park', county code-named 'Project Jarvis')

Minute Maid Road · Fort Pierce · St. Lucie County · Florida

Capacity not statedSource updated 10 September 2026approximate location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Undisclosed developer (marketed as 'Sentinel Grove Technology Park', county code-named 'Project Jarvis')
Address and locality
Minute Maid Road · Fort Pierce · St. Lucie County · Florida
Lifecycle status
reported cancelled
Facility type
data center
Reported capacity
Not stated
Source freshness
10 September 2026
Location precision
approximate
Source confidence
confirmed
Stable directory ID
dcd-dir-001305

What the source record says

Proposed 15-million-sq-ft, 1,218-acre campus on former citrus land east of Minute Maid Road near Orange Avenue (SR 68), Fort Pierce. St. Lucie's Planning and Zoning Commission voted 4-2 against recommending approval in late 2025; the applicant voluntarily withdrew the application on February 26, 2026, which a county commissioner attributed to anticipation of state AI/data-center legislation then advancing in Tallahassee (enacted as SB 484, effective July 1, 2026). Developer identity was not publicly disclosed in either source consulted this run. Coordinates corrected 2026-09-10: an earlier draft of this record and of willow-lakes-west-midway-fort-pierce-fl shared one pin (27.4467, -80.3256) that matched neither described parcel. This pin is derived by geocoding the landmarks the sources name — OpenStreetMap places the Minute Maid Road / Orange Avenue (SR 68) intersection at 27.44805, -80.55996, and the county description puts the site on the east side of Minute Maid Road about 2,600 ft north of that intersection, south and east of the SFWMD C-25 Canal; hence precision 'approximate' rather than a confirmed parcel. On the $13.5bn figure: the applicant's notice described it as an initial capital commitment for the FIRST 1,000 MW of capacity, not the cost of the full 15-million-sq-ft buildout. It is independently corroborated in sworn testimony before the Florida PSC, where FEIA's expert economist Dr. Fletcher Mangum projected that 'a single 1000 MW hyperscale data center campus in St. Lucie County would be expected to deliver: (i) $13.5 billion in total private capital investment over course of development' (Tr. 3423-24). Note that PSC figure is the output of an economic-impact model for a generic 1,000 MW St. Lucie campus, so it corroborates the magnitude rather than constituting an independent measurement of this project.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

No status history was supplied in this edition.

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID sentinel-grove-technology-park-fort-pierce-fl. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →