Facility snapshot
- Operator as published
- Atlas Compute (infrastructure by Penguin Solutions)
- Address and locality
- Post Office Road, Midway Industrial Park · Fort Pierce · St. Lucie County · Florida
- Lifecycle status
- reported proposed
- Facility type
- data center
- Reported capacity
- Planned: 240 MW (source-reported; boundary not independently verified)
- Source freshness
- 14 September 2026
- Location precision
- approximate
- Source confidence
- confirmed
- Stable directory ID
dcd-dir-000101
What the source record says
Land and utilities secured. Targeting operational Q4 2026-Q1 2027. Up to 1 GW expansion capacity. Distinct from the withdrawn Sentinel Grove/Project Jarvis project in the same county.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025-11-06 · reported proposed
Land and utilities secured for a 240 MW initial campus, with up to 1 GW expansion capacity.
Sources and attribution
- Atlas Compute secures land and utilities for 240 MW AI data center campus · GlobeNewswire
- Florida-based company announces plans to build AI data center in Fort Pierce · WFLX
- Massive AI Server Farm Sets Sights On Fort Pierce, Neighbors Want Answers
- TCPalm via Yahoo News — Atlas Compute's St. Lucie County campus would be powered by its own natural gas-fired power plant, on over 26 acres at Midway Industrial Park bordering the Treasure Coast Energy Center · TCPalm / Treasure Coast Newspapers
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID atlas-compute-ai-data-center-campus-fort-pierce-fl. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.