SDC Umatilla Campus

reported under construction

Sabey Data Centers

Wanapa Road · Umatilla · Umatilla County · Oregon

Planned 150 MWSource updated 5 September 2026exact location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Sabey Data Centers
Address and locality
Wanapa Road · Umatilla · Umatilla County · Oregon
Lifecycle status
reported under construction
Facility type
data center
Reported capacity
Planned: 150 MW (source-reported; boundary not independently verified)
Source freshness
5 September 2026
Location precision
exact
Source confidence
reported
Stable directory ID
dcd-dir-001287

What the source record says

Two-building, 714,540 sq ft multi-tenant campus. Groundbreaking originally Q1 2025, revised to 2024 per DCD; construction start as of July 2026 not independently confirmed. Investment figures conflicting across sources ($520M in one report, ~$950M in another); investmentUsd omitted. Coordinates are Umatilla city centroid. Planned capacity revised from 100 MW to 150 MW: the campus is described as designed to support more than 150 megawatts. Sabey's own materials give a more conservative "120 MW+", which is consistent rather than contradictory.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2023-09 · reported proposed

    Sabey Data Centers announced 60-acre land purchase in Umatilla; groundbreaking planned for 2024 (revised from Q1 2025 per DCD)

    Open cited source →

  2. 2026-07-15 · reported under construction

    Construction underway on the 714,540 sq ft, 150+ MW SDC Umatilla campus (Wanapa Road): work has been ongoing at the site since spring 2026 (rock excavation and blasting). The first of two data halls is targeted to go online April 2028.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID sabey-umatilla-or. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.