Prometheus Hyperscale Kaufman County Campus

reported proposed

Prometheus Hyperscale

Kaufman County · Texas

Planned 200 MWSource updated 25 August 2026approximate location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Prometheus Hyperscale
Address and locality
Kaufman County · Texas
Lifecycle status
reported proposed
Facility type
data center
Reported capacity
Planned: 200 MW (source-reported; boundary not independently verified)
Source freshness
25 August 2026
Location precision
approximate
Source confidence
reported
Stable directory ID
dcd-dir-001181

What the source record says

Four liquid-cooled buildings on ~500 acres west of Dallas between Talty and Post Oak Bend City, Kaufman County; behind-the-meter Jenbacher J620 gas generation plus an Engie North America battery storage tie-in. Distinct operator/site from the Flexential Talty campus in the same county. First facility targeted for 2026 operation.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

No status history was supplied in this edition.

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID prometheus-hyperscale-kaufman-county-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.