This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- Prometheus Hyperscale
- Address and locality
- Fort Morgan · Morgan County · Colorado
- Lifecycle status
- reported proposed
- Facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 26 August 2026
- Location precision
- approximate
- Source confidence
- reported
- Stable directory ID
dcd-dir-001180
What the source record says
Early-stage pipeline site. DCD reports Prometheus Hyperscale plans four data centers beyond its Evanston, Wyoming flagship — Pueblo and Fort Morgan in Colorado, Phoenix and Tucson in Arizona — with timelines and specifications not shared. Big Pivots separately reports the company intends to create data centers in Fort Morgan and Pueblo. No capacity, acreage, investment or permit filing is recorded because none is sourced. Coordinates are the Fort Morgan town centroid (approximate); no parcel is known. Deliberately not attributing the Evanston flagship's 1.25 GW to this site.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2024-10 · reported proposed
Named as one of four pipeline sites when Wyoming Hyperscale rebranded as Prometheus Hyperscale; no timeline or specifications shared.
Sources and attribution
- Wyoming Hyperscale becomes Prometheus Hyperscale, reveals pipeline of four additional sites (read via Internet Archive) · Data Center Dynamics
- Looming questions about data centers · Big Pivots
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID prometheus-hyperscale-fort-morgan-co. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.