Planned 1,250 MWSource updated 14 September 2026approximate location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Prometheus Hyperscale
Address and locality
Evanston · Uinta County · Wyoming
Lifecycle status
reported permitted
Facility type
data center
Reported capacity
Planned: 1,250 MW (source-reported; boundary not independently verified)
Source freshness
14 September 2026
Location precision
approximate
Source confidence
confirmed
Stable directory ID
dcd-dir-001179

What the source record says

506-acre 'Atlas Industrial Park' campus about 8-12 miles east of Evanston near the Silver Eagle refinery on County Road 180, south side of I-80 (Section 13, T15N R119W). Approved for 1.25GW initial IT capacity with a stated development path to 5GW; only the confirmed initial figure is recorded here.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-06 · reported permitted

    Uinta County Board of Commissioners granted unanimous Conditional Use Permit approval for the Atlas Industrial Park subdivision/rezone.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID prometheus-hyperscale-evanston-wy. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →