Licensed lead · not independently verified · dcd-dir-001177

Washington Township Technical Campus

reported cancelled

Prologis

South side of 32 Mile Road between M-53 and Powell Road · Washington · Macomb County · Michigan

Capacity not statedSource updated 9 September 2026approximate location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Prologis
Address and locality
South side of 32 Mile Road between M-53 and Powell Road · Washington · Macomb County · Michigan
Lifecycle status
reported cancelled
Facility type
data center
Reported capacity
Not stated
Source freshness
9 September 2026
Location precision
approximate
Source confidence
reported
Stable directory ID
dcd-dir-001177

What the source record says

312 acres on the south side of 32 Mile Road between M-53 and Powell Road, spanning four parcels near Romeo State Airport and the former Romeo Ford plant. Status 'cancelled' reflects the withdrawn application; the company's attorney stated an intent to return after the township revises its zoning ordinance, so this is a pause rather than confirmed abandonment. Note the rezoning alone would NOT have permitted a data center — the source states a further 'special land use' approval would have been required. CONFIRMED ABSENCES: no megawatt capacity, investment figure, building count, water figure or job count is stated in either source. Coordinates are the US Census geocoder's match for the 32 Mile Rd / Powell Rd intersection named in the source; the four-parcel boundary is not confirmed.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-11 · reported proposed

    Prologis submitted a conditional rezoning application for a technical campus and data center on 312 acres across four parcels, seeking an Industrial-Research-Technology district with a five-year reversion clause.

    Open cited source →

  2. 2026-05 · reported cancelled

    Prologis withdrew the rezoning application on 2026-05-19, stating it would wait until the township adopts a data-center ordinance before proceeding.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID prologis-washington-township-mi. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.