Nebius Birmingham AI Factory (BHM01)

reported under construction

Nebius Group

Birmingham · Jefferson County · Alabama

Planned 300 MWSource updated 9 September 2026exact location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Nebius Group
Address and locality
Birmingham · Jefferson County · Alabama
Lifecycle status
reported under construction
Facility type
data center
Reported capacity
Planned: 300 MW (source-reported; boundary not independently verified)
Source freshness
9 September 2026
Location precision
exact
Source confidence
confirmed
Stable directory ID
dcd-dir-001032

What the source record says

Nebius Group's Birmingham AI Factory (site code BHM01); distinct from nebius-vineland-nj and nebius-independence-mo. Capacity phased: Phase I = 100 MW (targeted H2 2026), Phase II adds 200 MW (full 300 MW by 2027-2028). Land acquisition $90M confirmed (2025-09-30); ~$855M in construction permits issued (April 2026) with $2.1B more under review; total capex described as 'tens of billions' (a projection) - so investmentUsd is omitted. ~100-125 projected permanent jobs (in notes, not jobs). Site: former Regions Lakeshore Operations Center (~80 acres) acquired from UAB, Regions Bank, and U.S. Steel; general contractor Hoar Construction. Coordinates address-approximate (201 Milan Pkwy, Oxmoor Corporate Park).

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-09-30 · reported permitted

    Land acquisition closed: ~80 acres at Milan Pkwy / Venice Rd acquired for $90M via affiliate Alabama ADC Holdings LLC

  2. 2026-01-29 · reported permitted

    Building permit BLD2026-00195 filed; project grandfathered before Birmingham's proposed data-center moratorium

  3. 2026-04-01 · reported under construction

    First construction permits issued (~$855M under contract); Hoar Construction begins work

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID nebius-bhm01-birmingham-al. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.