Facility snapshot
- Operator as published
- Edged Energy
- Address and locality
- 2801 College Road · Council Bluffs · Pottawattamie County · Iowa · 51503
- Lifecycle status
- reported under construction
- Facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 4 September 2026
- Location precision
- approximate
- Source confidence
- confirmed
- Stable directory ID
dcd-dir-000552
What the source record says
Two buildings of 285,445 sq ft each (570,000 sq ft total) plus an administrative building. The plan was amended down from two 80-foot-tall halls totaling roughly 900,000 sq ft to 36-foot-3-inch buildings; the Council Bluffs city council approved the amendment unanimously. Reporting differs on power delivery — the amended plan is described both as requiring a MidAmerican Energy substation on site and as using two owner-operated substations plus a switchyard — so no utility or capacity value is recorded. Distinct from Edged's Ankeny facility already tracked.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026-09-04 · reported under construction
Two-building campus under construction on the east side of Council Bluffs off Kanesville Boulevard between Iowa Western Community College and I-80; completion planned for 2027.
Sources and attribution
- Council Bluffs 'Project Lola' data center reduced in size, still planned near Iowa Western · 3 News Now (KMTV)
- Edged Energy: Council Bluffs Campus (Project Lola) · Baxtel
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID edged-council-bluffs-ia. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.