Edged Ankeny (Des Moines) Data Center

reported under construction

Edged Energy

2701 SE 90th Street · Ankeny · Polk County · Iowa

Planned 13.2 MWSource updated 16 September 2026approximate location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Edged Energy
Address and locality
2701 SE 90th Street · Ankeny · Polk County · Iowa
Lifecycle status
reported under construction
Facility type
data center
Reported capacity
Planned: 13.2 MW (source-reported; boundary not independently verified)
Source freshness
16 September 2026
Location precision
approximate
Source confidence
confirmed
Stable directory ID
dcd-dir-000554

What the source record says

AI-focused colocation developer (not a Big-5 hyperscaler) building a waterless-cooled, high-density facility at 9100 SE Four Mile Drive, Ankeny (address confirmed via secondary aggregators; coordinates are city-level, not parcel-geocoded — mark approximate). Design PUE 1.15 portfolio-wide; ThermalWorks closed-loop cooling claims >52M gal/yr water savings vs conventional. Third-party trade press (Site Selection Magazine, via search only — not independently fetched) cited a $187M investment and a 105,000 sq ft building; not included here since I couldn't confirm those two figures on a page I fetched myself. Also be aware: a 2024 DCD article (403'd on fetch, so NOT used as a source) described a much larger 'I-80 Commerce Center' two-building proposal (~535K + ~775K sq ft) at what looks like the same general site/intersection under 'Commerce Center LLC' — possibly an earlier or future-phase master plan for the same park. Could not verify, so this record covers ONLY the confirmed Edged 13.2MW project. Worth a follow-up pass to see if the 13.2MW figure has grown, since news headlines referenced the building having since 'topped out.'

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

No status history was supplied in this edition.

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID edged-energy-ankeny-ia. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →