This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- DataBank
- Address and locality
- Cartersville · Bartow County · Georgia
- Lifecycle status
- reported proposed
- Facility type
- data center
- Reported capacity
- Planned: 200 MW (source-reported; boundary not independently verified)
- Source freshness
- 10 September 2026
- Location precision
- exact
- Source confidence
- reported
- Stable directory ID
dcd-dir-000405
What the source record says
Project Indo: a 200 MW campus on 69 acres at 218 Industrial Park Rd, Cartersville, Bartow County (~288 MW grid connection filed); DRI submitted, first phase targeted 2032. Coordinates are the Cartersville area centroid. Public-reception check (2026-09-10): Checked a DCD-sourced writeup (2026-09-10, DCD's own page 403'd on direct fetch) covering the Development of Regional Impact filing (69 acres, 200MW, $2.4B at full build-out, first phase possibly 2032). No public hearing, resident reaction, or official statement of support/opposition documented in this source.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026 · reported proposed
DataBank filed a DRI for a 200 MW campus on 69 acres at 218 Industrial Park Rd in Cartersville (Bartow County); ~288 MW grid connection; 2032 first phase
Sources and attribution
- DataBank files for 200MW data center campus outside Atlanta, Georgia · Data Center Dynamics
- The Daily Tribune (Cartersville, GA) — Data center eyes Cartersville industrial site
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID databank-indo-cartersville-ga. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.