Licensed lead · not independently verified · dcd-dir-000365

CyrusOne DFW3-DFW5 (Allen)

reported operational

CyrusOne

Allen · Collin County · Texas

Planned 50 MWSource updated 26 July 2026exact location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
CyrusOne
Address and locality
Allen · Collin County · Texas
Lifecycle status
reported operational
Facility type
data center
Reported capacity
Planned: 50 MW (source-reported; boundary not independently verified)
Source freshness
26 July 2026
Location precision
exact
Source confidence
reported
Stable directory ID
dcd-dir-000365

What the source record says

Confirmed 90-acre, 3-building, 50MW campus at Allen, TX (largest DC development in the state per operator page). AI/HPC (likely): Allen campus marketed for AI training, HPC, multi-cloud.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

No status history was supplied in this edition.

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID cyrusone-dfw3-dfw5-allen-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →