This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- CyrusOne
- Address and locality
- Allen · Collin County · Texas
- Lifecycle status
- reported operational
- Facility type
- data center
- Reported capacity
- Planned: 50 MW (source-reported; boundary not independently verified)
- Source freshness
- 26 July 2026
- Location precision
- exact
- Source confidence
- reported
- Stable directory ID
dcd-dir-000365
What the source record says
Confirmed 90-acre, 3-building, 50MW campus at Allen, TX (largest DC development in the state per operator page). AI/HPC (likely): Allen campus marketed for AI training, HPC, multi-cloud.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
No status history was supplied in this edition.
Sources and attribution
- CyrusOne facility directory · CyrusOne
- OpenStreetMap way/590213771 · OpenStreetMap
- CyrusOne AI/HPC — Allen campus marketed for AI training, HPC, multi-cloud · datacenterknowledge.com
- Business Wire: CyrusOne Purchases Solar and Wind Energy in North Texas from Gexa Energy (Apr 2022) — names Allen, Carrollton, Lewisville
- DataCenterDynamics: CyrusOne signs 40MW wind and solar PPA with Gexa Energy in Texas
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID cyrusone-dfw3-dfw5-allen-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.