Facility snapshot
- Operator as published
- CyrusOne
- Address and locality
- 1366 FM488 · Fairfield · Freestone County · Texas · 75840
- Lifecycle status
- reported under construction
- Facility type
- data center
- Reported capacity
- Planned: 760 MW (source-reported; boundary not independently verified)
- Source freshness
- 26 August 2026
- Location precision
- approximate
- Source confidence
- reported
- Stable directory ID
dcd-dir-000367
What the source record says
Phase 1 (380MW) is under construction adjacent to Calpine's Freestone Energy Center at 1366 FM488, Fairfield, targeted operational Q4 2026; Calpine holds an exclusive agreement to also supply Phase 2 (an additional 380MW, planned total 760MW). Not previously tracked -- no existing Freestone County entries.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
No status history was supplied in this edition.
Sources and attribution
- Constellation and CyrusOne Announce Agreement to Support New Data Center Facility at Freestone Energy Center in Texas · CyrusOne
- Constellation and CyrusOne Announce Agreement to Support New Data Center Facility at Freestone Energy Center in Texas · Constellation Energy
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID cyrusone-freestone-energy-center-fairfield-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.