This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- CyrusOne
- Address and locality
- Bryn Mawr Avenue · Wood Dale · DuPage County · Illinois
- Lifecycle status
- reported under construction
- Facility type
- data center
- Reported capacity
- Planned: 18 MW (source-reported; boundary not independently verified)
- Source freshness
- 31 August 2026
- Location precision
- approximate
- Source confidence
- confirmed
- Stable directory ID
dcd-dir-000361
What the source record says
Operator states "the campus will include two buildings totaling more than 500,000 square feet, delivering an initial IT capacity of 18 megawatts with scalable capacity" — the 18MW is the initial IT capacity, not a full-build figure. Street-level coordinate is approximate: the press release names only Wood Dale, and the Bryn Mawr Avenue location comes from secondary reporting. Distinct from the tracked CyrusOne Aurora (CHI1–CHI3) and CyrusOne Sangamon County records.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025-05-13 · reported under construction
Topping-out ceremony marking completion of the structural framework; facility still under construction.
Sources and attribution
- CyrusOne Celebrates Wood Dale Topping Out Ceremony · CyrusOne
- Data Center Investment Program 2025 Annual Report (C1 Chicago 1 LLC - C1 Chicago 2 LLC, Wood Dale, 2024 MOU) · Illinois Department of Commerce and Economic Opportunity
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID cyrusone-chi6-wood-dale-il. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.