This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- Cipher Digital
- Address and locality
- Andrews · Andrews County · Texas
- Lifecycle status
- reported under construction
- Facility type
- data center
- Reported capacity
- Planned: 100 MW (source-reported; boundary not independently verified)
- Source freshness
- 25 July 2026
- Location precision
- approximate
- Source confidence
- reported
- Stable directory ID
dcd-dir-000248
What the source record says
Cipher's Stingray HPC/AI data center site, ~250 acres in Andrews County, Texas (west of the city of Andrews). Conditional ERCOT interconnection approval up to 100 MW; targeted energization H1/Q2 2026. Part of Cipher's ~3.4 GW / 8-site HPC pipeline. Cipher rebranded from Cipher Mining to Cipher Digital during its pivot to hyperscale HPC/AI hosting. Coordinates approximate (Andrews, TX geocode; exact parcel not confirmed). Cipher Mining was renamed Cipher Digital.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026-07-17 · reported under construction
Sources and attribution
- Cipher Digital (Cipher Mining) FY2025 Form 10-K (filed 2026-02-24) — Stingray Site, West Texas, conditional ERCOT interconnection up to 100 MW, energize H1 2026 · U.S. SEC (EDGAR)
- DCD — Cipher acquires Stingray, 250 acres in Andrews County (west of Andrews), 100 MW front-of-the-meter, energize Q2 2026 · Data Center Dynamics
- Cipher Mining — Announces Acquisition of New Site in West Texas (GlobeNewswire, Nov 26, 2024)