Licensed lead · not independently verified · dcd-dir-000132

AWS Clinton Data Center

source-reported under construction

Amazon Web Services

1001 Industrial Park Drive · Clinton · Hinds County · Mississippi

Capacity not statedSource updated 14 September 2026approximate location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for AWS Clinton Data Center.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Facility snapshot

Operator as published
Amazon Web Services
Address and locality
1001 Industrial Park Drive · Clinton · Hinds County · Mississippi
Official metro area
Jackson, MS
Source-reported status
under construction
Facility type
data center
Reported capacity
Not stated
Source freshness
14 September 2026
Location precision
approximate
Source confidence
confirmed
Stable directory ID
dcd-dir-000132

What the source record says

Net-new: this is a Hinds County site, distinct from the existing aggregate record aws-project-atlas-madison-county-ms, whose own notes name only the two Madison County complexes (Madison County Mega Site near Canton and the Costas Property in Ridgeland) and cite the Hinds County $1B figure only as part of Amazon's $25B statewide total — it has never been recorded as a facility. Site is the long-vacant former Delphi auto-parts plant in the Clinton Industrial Park, mostly empty since 2009; AWS describes it as the first time it has retrofitted an existing industrial building into a data center at this scale. Coordinates are a geocode of Clinton, MS (city centroid) — no source fetched in this run gives a street address or the industrial-park parcel. Confirmed absences: no source fetched states IT capacity in MW, acreage, or building square footage; no fee-in-lieu or PILOT agreement figure was found (the City of Clinton page states only that the investment will 'generate millions of dollars in new revenue'). Status is 'under_construction' rather than 'operational' deliberately: a ribbon-cutting was held 2026-06-12 but Entergy's account describes the project as under development and not yet operational, and a separate groundbreaking was also reported — the sources conflict on whether it has begun serving traffic. Water/cooling: reporting states the Clinton building will not use water and will use air cooling, but no fetched source in this run carries that sentence, so the water field is omitted rather than guessed.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-06-12 · source-reported under construction

    Ribbon-cutting held in Clinton marking Amazon's $1 billion investment converting the former Delphi manufacturing plant into a data center; Entergy's account describes the project as under development rather than in service.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID aws-clinton-hinds-ms. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →