AVAIO Digital Leo Campus

reported proposed

AVAIO Digital Partners

Pulaski County · Arkansas

Planned 1,000 MWSource updated 15 September 2026exact location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
AVAIO Digital Partners
Address and locality
Pulaski County · Arkansas
Lifecycle status
reported proposed
Facility type
data center
Reported capacity
Planned: 1,000 MW (source-reported; boundary not independently verified)
Source freshness
15 September 2026
Location precision
exact
Source confidence
confirmed
Stable directory ID
dcd-dir-000113

What the source record says

Location: off Interstate 530 near 145th Street, Pulaski County; coordinates are approximate for the I-530 corridor south of Little Rock. Named after the Leo constellation. Initial $6B investment may grow to $21B through full build-out. First phase completion targeted June 2027. Campus sits near long-haul fiber routes connecting Dallas, Atlanta, and Memphis. Q1 2026 construction start was planned as of announcement; current construction status unconfirmed as of research date. Fix: energy.source corrected from 'on_site_gas' to 'mixed'; onSiteGenerationMw removed — the 150 MW figure is the Entergy Arkansas grid supply contract, not on-site generation; on-site gas capacity is unquantified in sources. Arkansas's data-center sales-and-use tax exemption (Act 819 of 2023, expanded by Act 548 of 2025) likely applies given the investment scale, but no AVAIO-specific incentive award has been published.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-01 · reported proposed

    AVAIO Digital announces $6B+ AI-ready data center campus in Pulaski County; Governor Sanders describes it as largest economic investment in Arkansas history; construction targeted Q1 2026 start

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID avaio-digital-leo-little-rock-ar. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.