This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- Ardent Technologies
- Address and locality
- Wilmington · Clinton County · Ohio
- Lifecycle status
- reported proposed
- Facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 9 September 2026
- Location precision
- approximate
- Source confidence
- reported
- Stable directory ID
dcd-dir-000091
What the source record says
Second Wilmington data center rezoning, bringing the city's total data-center-zoned land to roughly 1,000 acres. Capacity, investment and job figures were not disclosed in the reporting. Distinct from the AWS campus on the city's south side.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026-02-19 · reported proposed
Wilmington City Council voted 5-2 to rezone 500 acres for a second data center, separate from the AWS site.
Sources and attribution
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID ardent-technologies-wilmington-clinton-oh. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.