Record details
- Record ID: microsoft-corporation-sat-89-90-tx
- Record type: project
- Developer: Not named in the cited records
- Operator: Microsoft Corporation
- Owner: Microsoft Corporation
- Tenant: Not named in the cited records
- Capacity: Unknown (No independently supported figure)
- Capacity boundary: No selected Comptroller or TDLR record states critical-IT or other MW. TDLR estimated cost and 489,400 square feet gross building area are not IT load and are not published as capacity.
- Location: 2995 US HWY 90 W, Castroville, TX
- County: Medina County
- Location precision: exact — TDLR TABS location. The Comptroller list row does not publish an address.
- Physical scale: TDLR TABS scope describes construction of two single-story data-center buildings, each containing five colos, plus associated campus site construction, and approximately 489,400 square feet gross building area. That is registered design scope, not occupied white space, a counted campus identity, or IT load.
How to read developer, owner, operator and tenant →
How to read power and capacity figures →
What remains unknown
- construction or operating evidence independent of TABS plan-review status
- developer if distinct from Microsoft
- tenant
- parcel identifiers
- site acres
- critical-IT and other MW capacity
Sources
-
Registered Qualifying Large Data Center Projects — Microsoft Corporation (SAT 89-90) →Gov. record
Exact location Registered Qualifying Large Data Center Projects table, Microsoft Corporation (SAT 89-90) row: effective date 04/04/2024; owner LD772702-OW1; occupant LD772702-OC1; operator LD772702-OP1
What it supports Project name, tax-program owner and operator labels; not address, construction status or IT load.
-
TDLR TABS Project TABS2025012765 — SAT89/90 Data Center →Gov. record
Exact location Project Details: location address and county; Type of Work New Construction; Scope of Work two buildings plus associated campus site construction; Current Status Review Complete; Owner Name Microsoft Corporation
What it supports Street address, city, county, two-building physical scope, owner name on the accessibility registration; not construction progress or IT load.
Record history
Record history · 4 April 2024 · DataCenterData review
microsoft-corporation-sat-89-90-tx → Record
Why Comptroller list effective date for Microsoft Corporation (SAT 89-90) as a qualifying large data-center project.
Evidence No additional evidence link; see the linked record or claim.
Record history · 25 February 2025 · DataCenterData review
microsoft-corporation-sat-89-90-tx → Record
Why TDLR TABS registration date for SAT89/90 Data Center.
Evidence No additional evidence link; see the linked record or claim.
Data + actions
Suggest a correction → Include record ID microsoft-corporation-sat-89-90-tx, the field, and a supporting primary source. Accepted corrections appear on Changes.