Licensed lead · not independently verified · dcd-dir-001569

Project Lincoln: OC Data Center

reported cancelled

Western Hospitality Partners

3557 North Highway 53 · La Grange · Oldham County · Kentucky

Planned 600 MWSource updated 10 September 2026approximate location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Western Hospitality Partners
Address and locality
3557 North Highway 53 · La Grange · Oldham County · Kentucky
Lifecycle status
reported cancelled
Facility type
data center
Reported capacity
Planned: 600 MW (source-reported; boundary not independently verified)
Source freshness
10 September 2026
Location precision
approximate
Source confidence
confirmed
Stable directory ID
dcd-dir-001569

What the source record says

This record covers the original 267-acre 'Project Lincoln' filing. Confirmed absence: no source fetched in this run documents the final disposition of the smaller, relocated ~100MW alternative proposal — a maintainer should re-check before treating the whole Western Hospitality Partners effort in Oldham County as fully closed.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-03 · reported proposed

    Project Lincoln: OC Data Center application announced 2025-03-28 for a 267.3-acre site at 3557 North Highway 53, La Grange; required a Conditional Use Permit as a Private Utility Building since data centers lacked a specific zoning classification in Oldham County. Technical Review Committee was scheduled for 2025-04-16, Board of Adjustments & Appeals hearing expected May 2025.

    Open cited source →

  2. 2025-07 · reported cancelled

    Original 267-acre application withdrawn amid opposition; Oldham County Fiscal Court passed a 150-day data-center moratorium 4-2 on 2025-07-02 with no exemption carved out for the pending Western Hospitality application. Developer pursued a smaller, relocated ~100 MW proposal at a different site (the Sauerbeck family drive-in theater property) within the county; baxtel.com's tracking record for this original filing lists status as 'Project cancelled before construction.'

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID western-hospitality-partners-project-lincoln-oldham-county-ky. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →