This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- Thor Equities
- Address and locality
- Kingston · Bartow County · Georgia
- Lifecycle status
- reported proposed
- Facility type
- data center
- Reported capacity
- Planned: 150 MW (source-reported; boundary not independently verified)
- Source freshness
- 10 September 2026
- Location precision
- approximate
- Source confidence
- reported
- Stable directory ID
dcd-dir-001450
What the source record says
A 350,000 sq ft data center on approximately 559 acres, drawing up to 150 MW at peak, with projected annual tax revenue of $2 million. Rezoning had not been granted at the time of reporting. Coordinates are approximate to Kingston.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026-09-08 · reported proposed
Development of Regional Impact filed with the Georgia Department of Community Affairs; Thor Equities will ask Bartow County to rezone 559 acres. Completion targeted for 2030.
Sources and attribution
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID thor-equities-kingston-technology-hub-bartow-ga. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.