Thor Equities Augusta Township Data Center (Form8tion)

reported cancelled

Thor Equities

Augusta Township · Washtenaw County · Michigan

Capacity not statedSource updated 9 September 2026exact location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Thor Equities
Address and locality
Augusta Township · Washtenaw County · Michigan
Lifecycle status
reported cancelled
Facility type
data center
Reported capacity
Not stated
Source freshness
9 September 2026
Location precision
exact
Source confidence
reported
Stable directory ID
dcd-dir-001449

What the source record says

Site north of Milan-Oakville Road, east of Hitchingham Road, Augusta Township, Washtenaw County MI (between Ann Arbor and Monroe). No end user announced; planners cited Google and Microsoft as typical users of this facility type. Form8tion is Thor's digital infrastructure arm (founded March 2023). Capacity not disclosed; at least five large buildings planned. Voter referendum outcome will determine project viability. Coordinates are approximate Augusta Township centroid. SOURCE CONFLICT RESOLVED 2026-08-08: the earlier "rejected by voters" claim in an article predating the election was a pre-election piece describing the UPCOMING vote — the dates now reconcile because the referendum has since been held. Augusta Township voters overturned the 522-acre rezoning on 2026-08-04 (about 90% to overturn), so the parcels revert to agricultural residential. Recorded as "cancelled" because the project's enabling rezoning is gone; note that Thor Equities has NOT publicly withdrawn, and the results were unofficial as of 2026-08-05 — revisit if the developer re-applies or the count is certified differently. Status re-check, NO change: the record's 'cancelled' status dated 2026-08-04 corresponds to the Aug. 4 veto referendum on the 522-acre rezoning, and nothing found indicates a revival, appeal or re-rezoning since. CAVEAT: I could not fetch a page carrying the certified vote totals - the Ballotpedia result page returned empty content - so this confirms the mechanism and date, not the tally. Worth one more check before the record is treated as settled.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2024 · reported proposed

    Thor Equities (via Form8tion / JDS Equities II LLC) acquires 810 acres in Augusta Township; seeks rezoning of 522 acres from agricultural/residential to General Industrial

    Open cited source →

  2. 2025-06 · reported proposed

    Augusta Township Planning Commission recommends denial 5-1, citing inconsistency with land-use plans

    Open cited source →

  3. 2025-07 · reported proposed

    Augusta Township Board of Trustees unanimously approves rezoning of 522 acres despite Planning Commission denial

    Open cited source →

  4. 2025-08 · reported proposed

    Residents collect 957 signatures for ballot initiative (threshold was 561); question set for 2026 ballot (May or August primary election) to overturn rezoning

    Open cited source →

  5. 2026-08-04 · reported cancelled

    Augusta Township voters overturned the rezoning at the August primary — about 90% voted to overturn — returning the seven parcels to agricultural residential and removing the zoning the project depended on. Results were still unofficial as of 2026-08-05.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID thor-equities-augusta-township-mi. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.