Licensed lead · not independently verified · dcd-dir-001425

Project Tallmadge

reported proposed

Takanock, LLC

Strasburg · Shenandoah County · Virginia

Planned 180 MWSource updated 9 September 2026approximate location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Takanock, LLC
Address and locality
Strasburg · Shenandoah County · Virginia
Lifecycle status
reported proposed
Facility type
data center
Reported capacity
Planned: 180 MW (source-reported; boundary not independently verified)
Source freshness
9 September 2026
Location precision
approximate
Source confidence
confirmed
Stable directory ID
dcd-dir-001425

What the source record says

87-acre site on Borden Mowery Drive near Interstate 81 Exit 296 and the Mercury Paper plant in Strasburg's industrial park; roughly 2 million sq ft planned. Takanock develops the land and intends to sell to an as-yet-unnamed operator. Construction reported as potentially starting in late 2027 and concluding around 2030.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-06-22 · reported proposed

    Developer Takanock proposing a 180MW, 87-acre campus on land already zoned industrial, so data center use is by-right; additional permitting targeted for Q3 2027 with construction beginning the same quarter.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID takanock-project-tallmadge-strasburg-va. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →