This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- STACK Infrastructure
- Address and locality
- Falmouth · Stafford County · Virginia
- Lifecycle status
- reported permitted
- Facility type
- data center
- Reported capacity
- Planned: 1,100 MW (source-reported; boundary not independently verified)
- Source freshness
- 26 July 2026
- Location precision
- approximate
- Source confidence
- confirmed
- Stable directory ID
dcd-dir-001355
What the source record says
523.94 acres, up to 23 buildings, 5.8-7.9M sq ft, six 300MW substations; rezoning approved Sept 2025.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025-09-01 · reported permitted
Rezoning approved September 2025.
Sources and attribution
- Stafford County Zoning Reclassification case — data center · Stafford County VA
- STACK plans 1GW campus in Stafford County · Data Center Dynamics
- HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage) · Oak Ridge National Laboratory (ORNL) / HIFLD
- STACK Infrastructure press release (GlobeNewswire), Jan 16 2025
- The FXBG Advance — "Stafford Supervisors Approve Stafford Technology Center"
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID stack-stafford-technology-campus-va. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.