Licensed lead · not independently verified · dcd-dir-001346

STACK Infrastructure Goldendale Data Center

reported proposed

STACK Infrastructure

Goldendale · Klickitat County · Washington

Planned 958 MWSource updated 22 August 2026approximate location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
STACK Infrastructure
Address and locality
Goldendale · Klickitat County · Washington
Lifecycle status
reported proposed
Facility type
data center
Reported capacity
Planned: 958 MW (source-reported; boundary not independently verified)
Source freshness
22 August 2026
Location precision
approximate
Source confidence
reported
Stable directory ID
dcd-dir-001346

What the source record says

Identified via a 2022 Puget Sound Energy interconnection filing describing a 958MW STACK data center in 'study phase,' sited on a portion of a 700-acre former aluminum smelter (ex-Lockheed Martin) near the John Day Dam. STACK has not publicly confirmed its involvement.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

No status history was supplied in this edition.

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID stack-infrastructure-goldendale-data-center-wa. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →