This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- STACK Infrastructure
- Address and locality
- Lancaster · Dallas County · Texas
- Lifecycle status
- reported under construction
- Facility type
- data center
- Reported capacity
- Planned: 500 MW (source-reported; boundary not independently verified)
- Source freshness
- 26 August 2026
- Location precision
- approximate
- Source confidence
- reported
- Stable directory ID
dcd-dir-001344
What the source record says
193-acre campus in south Dallas County, described by the operator as under development with up to 500 MW available; earlier reporting described a 220 MW first build of six 36 MW data centers across roughly 1.5 million sq ft off E Belt Line Road. Status is recorded as under construction on the strength of the operator's 'under development' framing and committed substation; treat as provisional. Coordinates are a city-level geocode.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
No status history was supplied in this edition.
Sources and attribution
- Dallas/Ft. Worth Hyperscale Data Center Campus — operator location page · STACK Infrastructure
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID stack-dfw02-lancaster-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.