Facility snapshot
- Operator as published
- Undisclosed data center developer (landowner Joshua Harrelson)
- Address and locality
- LaGrange · Troup County · Georgia
- Lifecycle status
- reported proposed
- Facility type
- data center
- Reported capacity
- Planned: 600 MW (source-reported; boundary not independently verified)
- Source freshness
- 10 September 2026
- Location precision
- approximate
- Source confidence
- reported
- Stable directory ID
dcd-dir-001168
What the source record says
Six buildings at 252,000 sq ft each, $9.7 billion over eight years, 600 MW, with its own substation and 570 projected jobs at an average of $80,000. This is a separate site from Google's LaGrange data center, which is at 411 Pegasus Parkway off I-85 and was announced in April 2026 by Google itself; the tracked google-lagrange-ga record covers that one. Coordinates are approximate to LaGrange.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025-03-08 · reported proposed
Development of Regional Impact filed for a six-building, 1.5 million sq ft campus on 513 acres of unincorporated Troup County, with a requested annexation into the City of LaGrange. Phases targeted for 2028, 2030 and 2033.
Sources and attribution
- Massive $9.7 billion data center proposed in Troup County · Atlanta Journal-Constitution
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID project-west-lagrange-troup-ga. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.