Remington Technology Park

reported permitted

PointOne Holdings Inc.

Remington · Fauquier County · Virginia

Planned 600 MWSource updated 16 August 2026approximate location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
PointOne Holdings Inc.
Address and locality
Remington · Fauquier County · Virginia
Lifecycle status
reported permitted
Facility type
data center
Reported capacity
Planned: 600 MW (source-reported; boundary not independently verified)
Source freshness
16 August 2026
Location precision
approximate
Source confidence
reported
Stable directory ID
dcd-dir-001125

What the source record says

Strongest of the Fauquier speculative cluster: approved status (not merely filed/on-hold), specific street address given by the county database. Confidence set to 'confirmed' on that basis. Fauquier planning-database roundup; long-standing (2018-approved) Remington Technology Park — verify against any existing record before elevating.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-07-17 · reported proposed

    proposed per Fauquier County planning staff project database (maintained record of application status)

    Open cited source →

  2. 2026-07-17 · reported permitted

    Remington Technology Park (PointOne Holdings, Canada) was originally rezoned/approved in 2018 and is the only Remington-area data center to have begun site work. On 2026-07-10 the Fauquier Board of Supervisors approved a rezoning for an on-site natural-gas fuel-cell power plant to serve the campus (needed due to Dominion energization-schedule changes; without it construction would slip toward 2030

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID pointone-remington-technology-park-fauquier-va. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →