Licensed lead · not independently verified · dcd-dir-001123

PNNL AI Data Center

reported proposed

Battelle Memorial Institute (Pacific Northwest National Laboratory)

Richland · Benton County · Washington

Planned 2 MWSource updated 10 September 2026approximate location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Battelle Memorial Institute (Pacific Northwest National Laboratory)
Address and locality
Richland · Benton County · Washington
Lifecycle status
reported proposed
Facility type
data center
Reported capacity
Planned: 2 MW (source-reported; boundary not independently verified)
Source freshness
10 September 2026
Location precision
approximate
Source confidence
reported
Stable directory ID
dcd-dir-001123

What the source record says

Battelle, which operates PNNL for the Department of Energy, issued a request for information for an on-premises next-generation AI compute data center to train and operationalize large language models for scientific and national government missions. Roughly 2 MW at a possible 2028 launch, with potential future expansion to about 40 MW. This would be DOE-funded and DOE-operated, not a private operator building on federal land. No construction decision has been made — this is an RFI-stage proposal only. Coordinates are an approximate geocode of the PNNL campus in Richland. Public-reception check (2026-09-10): Checked The Spokesman-Review's coverage (2026-09-10) of this DOE Genesis Mission-linked project; it covers technical specs and funding, with no resident, community-group, or elected-official reaction documented.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-04-26 · reported proposed

    PNNL confirmed it is 'considering the possibility of a small data center due to increased focus on AI at PNNL'; the RFI response window had closed.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID pnnl-ai-data-center-richland-wa. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →