Licensed lead · not independently verified · dcd-dir-000100

Atlas Agro Richland Data Center Campus

reported proposed

Atlas Agro North America

2100 Horn Rapids Road · Richland · Benton County · Washington

Planned 320 MWSource updated 10 September 2026approximate location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Atlas Agro North America
Address and locality
2100 Horn Rapids Road · Richland · Benton County · Washington
Lifecycle status
reported proposed
Facility type
data center
Reported capacity
Planned: 320 MW (source-reported; boundary not independently verified)
Source freshness
10 September 2026
Location precision
approximate
Source confidence
reported
Stable directory ID
dcd-dir-000100

What the source record says

Swiss fertilizer developer Atlas Agro offered the City of Richland just under $24 million for 275 acres in the Northwest Advanced Clean Energy Park, adjacent to its planned zero-carbon nitrate fertilizer plant. The campus would comprise five data center buildings of roughly 500,000 sq ft each, with construction targeted to begin in 2027. Columbia Riverkeeper's February 2026 report puts the campus's power requirement at at least 320 MW. Power would come via a Bonneville Power Administration line serving both the data center and the fertilizer plant. Atlas Agro's North American president describes the data center as 'a partner that helps us build the necessary power and utility infrastructure.' Coordinates are an approximate geocode of the stated address.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-12-02 · reported proposed

    Richland City Council unanimously approved a land-option agreement with Atlas Agro for 275 acres at 2100 Horn Rapids Road, with a $250,000 nonrefundable option fee.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID atlas-agro-richland-data-center-campus-wa. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.