Facility snapshot
- Operator as published
- Atlas Agro North America
- Address and locality
- 2100 Horn Rapids Road · Richland · Benton County · Washington
- Lifecycle status
- reported proposed
- Facility type
- data center
- Reported capacity
- Planned: 320 MW (source-reported; boundary not independently verified)
- Source freshness
- 10 September 2026
- Location precision
- approximate
- Source confidence
- reported
- Stable directory ID
dcd-dir-000100
What the source record says
Swiss fertilizer developer Atlas Agro offered the City of Richland just under $24 million for 275 acres in the Northwest Advanced Clean Energy Park, adjacent to its planned zero-carbon nitrate fertilizer plant. The campus would comprise five data center buildings of roughly 500,000 sq ft each, with construction targeted to begin in 2027. Columbia Riverkeeper's February 2026 report puts the campus's power requirement at at least 320 MW. Power would come via a Bonneville Power Administration line serving both the data center and the fertilizer plant. Atlas Agro's North American president describes the data center as 'a partner that helps us build the necessary power and utility infrastructure.' Coordinates are an approximate geocode of the stated address.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025-12-02 · reported proposed
Richland City Council unanimously approved a land-option agreement with Atlas Agro for 275 acres at 2100 Horn Rapids Road, with a $250,000 nonrefundable option fee.
Sources and attribution
- Richland OKs option agreement for Atlas Agro data center · Tri-Cities Area Journal of Business
- A Closer Look: Columbia River Data Centers (February 2026) — Benton County, Washington · Columbia Riverkeeper
- What to know about 4 major data center proposals for Tri-Cities area · Tri-City Herald (via Yahoo News)
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID atlas-agro-richland-data-center-campus-wa. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.