Meta Sarpy Campus (Springfield expansion)

reported under construction

Meta

Springfield · Sarpy County · Nebraska

Capacity not statedSource updated 14 September 2026exact location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Meta
Address and locality
Springfield · Sarpy County · Nebraska
Lifecycle status
reported under construction
Facility type
data center
Reported capacity
Not stated
Source freshness
14 September 2026
Location precision
exact
Source confidence
confirmed
Stable directory ID
dcd-dir-000950

What the source record says

Campus spans Papillion and Springfield, Sarpy County. Existing multi-building campus operational since 2019; ongoing expansion toward a 9-building, 4-million-sq-ft footprint. Meta has invested more than $1.5B at this site since 2017 (confirmed by DCD and multiple sources; a $2.5B total figure appeared in the record but was not supported by any cited source). Planned MW capacity of 2,000 was removed — no source confirms a MW figure for this campus. Springfield buildings were targeted for completion by end 2024; operational status of those buildings as of mid-2026 should be verified against a current source. Coordinates approximate for the Springfield expansion area; original Papillion buildings are slightly northeast.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2019 · reported operational

    Initial campus buildings become operational in Papillion/Sarpy County

  2. 2022-07 · reported under construction

    Meta announces 9-building, 4 million sq ft expansion; acquires 500+ acres in Springfield south of Papillion campus; Springfield completion targeted end 2024 per 2022 announcement

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID meta-sarpy-springfield-ne. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →