Meta Kuna Data Center

reported under construction

Meta

Kuna · Ada County · Idaho

Capacity not statedSource updated 8 August 2026exact location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Meta
Address and locality
Kuna · Ada County · Idaho
Lifecycle status
reported under construction
Facility type
data center
Reported capacity
Not stated
Source freshness
8 August 2026
Location precision
exact
Source confidence
confirmed
Stable directory ID
dcd-dir-000940

What the source record says

960,000 sq ft campus (Meta's 15th US data center). Originally Project Peregrine. Construction paused December 2022, restarted October 2023 with AI-optimized architecture; new design 31% cheaper and half the build time. Peak construction employed 1,400 workers. Expected operational end of 2026. Water infrastructure cost sourced to CEG ($70M) but Idaho Business Review cites $100M — discrepancy unresolved; use CEG figure as primary. Coordinates are Kuna city centroid; exact site is west of city center. As of December 2025, the campus was in the "final stages" of construction; local reporting notes power demand will not be clear until the site comes online.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2022-05 · reported proposed

    Project Peregrine: 485-acre site in Kuna, Ada County announced

    Open cited source →

  2. 2022-09 · reported under construction

    Broke ground September 2022

    Open cited source →

  3. 2023-10 · reported under construction

    Construction resumed after December 2022 pause; new AI-optimized design with denser GPU deployment support

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID meta-kuna-id. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →