Meta Hyperion

reported under construction

Meta

Delhi vicinity · Richland County · Louisiana

Planned 2,000 MWSource updated 15 September 2026exact location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Meta
Address and locality
Delhi vicinity · Richland County · Louisiana
Lifecycle status
reported under construction
Facility type
data center
Reported capacity
Planned: 2,000 MW (source-reported; boundary not independently verified)
Source freshness
15 September 2026
Location precision
exact
Source confidence
reported
Stable directory ID
dcd-dir-000937

What the source record says

A second, larger Meta data center development at the same Richland Parish complex is in progress under the internal name 'Project Evest' (Evest LLC, a Meta subsidiary and Laidley affiliate), the subject of a new, not-yet-docketed LPSC certification application (Direct Testimony of Laura K. Beauchamp on behalf of Entergy Louisiana, filed March 2026, public-redacted version). The testimony states Evest 'seeks to develop adjacent to Laidley's data center in Richland Parish, Louisiana, that was the subject of the proceedings in LPSC Docket No. U-37425' (i.e., the already-tracked Hyperion project). To serve Evest, Entergy is seeking certification of seven new 754 MW 1x1 CCCT generators (four near the Richland Parish site, three sited near the existing Big Cajun site in Pointe Coupee Parish) plus battery storage co-located at the Bogalusa West Solar and Cypress Harvest Solar facilities -- on top of the three CCCTs (Franklin Farms 1&2, Waterford 5) already approved for Hyperion itself. Investigative coverage (The Lens, 2026-04-14) puts the combined Hyperion+Evest generation build at 10 new gas plants, 7,000+ MW, and $16B+ in new fossil-fuel infrastructure serving this one customer, and reports the underlying Entergy-Meta commercial agreements are not fully public. This is DISTINCT NEW information not yet reflected in the existing record's notes/community fields (which per the roster are already populated) -- flagging for maintainer review rather than as a field-merge, since 'community' on this record is locked (already has a value) and it is not yet certain whether Evest will ship as a second facility record or as an update to this one once its own docket number and site-specific coordinates are public.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-01 · reported proposed

    Announced as part of Meta's $65B 2025 capex plan; described as a 2-gigawatt AI data center campus

    Open cited source →

  2. 2025 · reported under construction

    Site preparation and construction underway

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID meta-hyperion-richland-parish-la. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →