Licensed lead · not independently verified · dcd-dir-000932

Meta El Paso AI Data Center Campus

reported under construction

Meta

El Paso · El Paso County · Texas

Planned 1,000 MWSource updated 8 September 2026exact location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Meta
Address and locality
El Paso · El Paso County · Texas
Lifecycle status
reported under construction
Facility type
data center
Reported capacity
Planned: 1,000 MW (source-reported; boundary not independently verified)
Source freshness
8 September 2026
Location precision
exact
Source confidence
confirmed
Stable directory ID
dcd-dir-000932

What the source record says

Campus located in far Northeast El Paso near Texas-New Mexico state line on approximately 1,000 acres; coordinates are approximate city-area centroid, exact parcel not publicly identified. Meta's third Texas data center. Campus can scale to 1 GW. Construction jobs figure (4,000) reflects updated peak estimate from March 2026 $10B expansion announcement.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-10 · reported proposed

    Meta announces El Paso campus with initial $1.5B investment.

    Open cited source →

  2. 2025-10 · reported under construction

    Groundbreaking October 15, 2025. Site is Meta's 29th data center globally, third in Texas.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID meta-el-paso-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →