Facility snapshot
- Operator as published
- IREN (Iris Energy)
- Address and locality
- Alva · Woods County · Oklahoma
- Lifecycle status
- reported proposed
- Facility type
- data center
- Reported capacity
- Planned: 1,600 MW (source-reported; boundary not independently verified)
- Source freshness
- 10 September 2026
- Location precision
- exact
- Source confidence
- reported
- Stable directory ID
dcd-dir-000814
What the source record says
~2,000-acre land bank near Alva, Woods County, with a secured 1.6 GW power allocation on the Southwest Power Pool grid; initial power ramp scheduled for 2028. IREN's land-bank expansion beyond its operational Texas campuses (Childress, Sweetwater). Single-tracker source → confidence reported. Coordinates are the Alva area centroid. Capacity re-sourced 2026-08-08: IREN's own Oklahoma page states "1,600 MW", "2,000 Acres" and "2028 Substation Energization", status "IN DEVELOPMENT" — replacing an aggregator listing as the basis for the figure. Public-reception check (2026-09-10): Checked baxtel.com's project profile (2026-09-10) -- it covers only technical/permitting facts (2,000-acre site on the SPP grid) plus one unrelated statewide article (Oklahoma's data-center ratepayer-protection bill, 2026-05-16). No hearing, resident reaction, or local-official statement specific to the Woods County/Alva site was found in this source.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026 · reported proposed
IREN land bank of ~2,000 acres in Woods County with a secured 1.6 GW power allocation on the SPP grid; power ramp from 2028
Sources and attribution
- IREN Woods County Oklahoma · Baxtel
- HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage) · Oak Ridge National Laboratory (ORNL) / HIFLD
- IREN Oklahoma data center — 1,600 MW, 2,000 acres, 2028 substation energization · IREN
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID iren-woods-county-ok. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.