Planned 1,600 MWSource updated 10 September 2026exact location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
IREN (Iris Energy)
Address and locality
Alva · Woods County · Oklahoma
Lifecycle status
reported proposed
Facility type
data center
Reported capacity
Planned: 1,600 MW (source-reported; boundary not independently verified)
Source freshness
10 September 2026
Location precision
exact
Source confidence
reported
Stable directory ID
dcd-dir-000814

What the source record says

~2,000-acre land bank near Alva, Woods County, with a secured 1.6 GW power allocation on the Southwest Power Pool grid; initial power ramp scheduled for 2028. IREN's land-bank expansion beyond its operational Texas campuses (Childress, Sweetwater). Single-tracker source → confidence reported. Coordinates are the Alva area centroid. Capacity re-sourced 2026-08-08: IREN's own Oklahoma page states "1,600 MW", "2,000 Acres" and "2028 Substation Energization", status "IN DEVELOPMENT" — replacing an aggregator listing as the basis for the figure. Public-reception check (2026-09-10): Checked baxtel.com's project profile (2026-09-10) -- it covers only technical/permitting facts (2,000-acre site on the SPP grid) plus one unrelated statewide article (Oklahoma's data-center ratepayer-protection bill, 2026-05-16). No hearing, resident reaction, or local-official statement specific to the Woods County/Alva site was found in this source.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026 · reported proposed

    IREN land bank of ~2,000 acres in Woods County with a secured 1.6 GW power allocation on the SPP grid; power ramp from 2028

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID iren-woods-county-ok. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →