IREN Horizon — Childress, TX

reported under construction

IREN (Iris Energy)

Childress · Childress County · Texas

Planned 750 MWSource updated 25 July 2026exact location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
IREN (Iris Energy)
Address and locality
Childress · Childress County · Texas
Lifecycle status
reported under construction
Facility type
data center
Reported capacity
Planned: 750 MW (source-reported; boundary not independently verified)
Source freshness
25 July 2026
Location precision
exact
Source confidence
confirmed
Stable directory ID
dcd-dir-000811

What the source record says

SEPARATE SITE from IREN Sweetwater (Nolan/Fisher County — do not conflate). Full 750 MW figure is total campus transmission capacity; the AI/Microsoft Horizon 1–4 build-out comprises four 50 MW IT (75 MW gross) liquid-cooled data halls = 200 MW IT total, targeting end-2026 delivery. Horizon 1 (50 MW IT / 75 MW gross) energized Q4 2025 — operational; Horizons 2–4 remain under construction as of mid-2026. Coordinates approximate (county seat area). Site is a 576-acre freehold parcel with on-site 345 kV substations connecting directly to ERCOT. Investment for Horizon 1–4 reported as $300–350M (range; not a firm figure — omitted from investmentUsd). Microsoft contract ($9.7B total, 5-year through ~2031) covers NVIDIA GB300 Blackwell Ultra GPU cloud services; 20% upfront prepayment funded capex. Dell Technologies hardware supply agreement: $5.8B. IREN also holds a separate NVIDIA cloud services contract at Childress. Rack density 130–200 kW per rack; projected PUE 1.05–1.10. Approximately 25 current full-time local employees, 50+ expected at 750 MW full build-out; over 500 contractors during construction phase (approximate reported figures — omitted from jobs numeric fields). IREN Community Grants Program distributes $250,000 annually to the Childress area.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025 · reported under construction

    Horizon 1 (75 MW gross / 50 MW IT) announced March 11, 2025; construction underway at existing Childress campus

    Open cited source →

  2. 2025 · reported under construction

    IREN signs $9.7B five-year Microsoft GPU cloud contract November 2025; Horizons 1–4 at Childress targeted for end-2026 full deployment

    Open cited source →

  3. 2025 · reported operational

    Horizon 1 (50 MW IT / 75 MW gross) energized Q4 2025 — IREN's first purpose-built AI data center; Horizons 2–4 remain under construction

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID iren-horizon-childress-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →