Licensed lead · not independently verified · dcd-dir-000760

King George Technology Center

reported proposed

Green Energy Ventures

King George · King George County · Virginia

Capacity not statedSource updated 26 August 2026exact location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Green Energy Ventures
Address and locality
King George · King George County · Virginia
Lifecycle status
reported proposed
Facility type
data center
Reported capacity
Not stated
Source freshness
26 August 2026
Location precision
exact
Source confidence
reported
Stable directory ID
dcd-dir-000760

What the source record says

352 acres (40 already industrial-zoned) in the Route 3 West Settlement Area, bordering Stafford; rezoning pending.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-07-17 · reported proposed

    352 acres (40 already industrial-zoned) in the Route 3 West Settlement Area, bordering Stafford; rezoning pending.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID green-energy-ventures-king-george-technology-center-va. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →