Galaxy Helios Data Center Campus

reported under construction

Galaxy Digital

Afton · Dickens County · Texas

Planned 1,630 MWSource updated 9 July 2026exact location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Galaxy Digital
Address and locality
Afton · Dickens County · Texas
Lifecycle status
reported under construction
Facility type
data center
Reported capacity
Planned: 1,630 MW (source-reported; boundary not independently verified)
Source freshness
9 July 2026
Location precision
exact
Source confidence
confirmed
Stable directory ID
dcd-dir-000690

What the source record says

Converted from Bitcoin mining to AI/HPC. CoreWeave is the anchor tenant using the campus for large-scale AI model training. Location is near Afton, Dickens County (West Texas). Original site was 160 acres; campus has since expanded to 2,200+ acres across multiple phases. Coordinates are approximate.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2022-05 · reported operational

    Campus originally built by Argo Blockchain as Bitcoin mining facility (May 2022). Galaxy acquired from Argo in late 2022.

    Open cited source →

  2. 2026-01 · reported under construction

    ERCOT approves additional 830 MW (total 1.6 GW). CoreWeave leases full 800 MW under 15-year agreement worth avg $1B/year. First data hall delivered to CoreWeave in 2026.

    Open cited source →

  3. 2026-07 · reported under construction

    Phase I complete: 133MW critical IT load (200MW gross power) delivered to CoreWeave under 15-year leases (two 5-year extension options); rent commencement Q2 2026. Phase II (260MW critical IT load) in development, deliveries expected H1 2027. CoreWeave's total commitment across all phases now 526MW critical IT load. Total approved campus capacity 1.63GW, potential to scale to 3.6GW. Campus now spans 2,200+ acres (expanded from the original 160-acre site).

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID galaxy-helios-dickens-county-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →