This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- ECL
- Address and locality
- Santa Clara · Santa Clara County · California
- Lifecycle status
- reported proposed
- Facility type
- data center
- Reported capacity
- Planned: 35 MW (source-reported; boundary not independently verified)
- Source freshness
- 6 July 2026
- Location precision
- exact
- Source confidence
- reported
- Stable directory ID
dcd-dir-000522
What the source record says
Exact street address not publicly disclosed. Coordinates are Santa Clara city centroid (approximate). Announced April 21, 2026. First phase targets Q4 2026 delivery. ECL CEO Yuval Bachar stated the project addresses SVP grid capacity constraints that have forced other data center developers into multi-year interconnection queues. Project targets AI training and inference workloads.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026-04 · reported proposed
ECL publicly announced CSC-1, a 35MW FlexGrid-powered AI data center in Santa Clara; first phase delivery targeted Q4 2026
Sources and attribution
- ECL 35MW FlexGrid-Powered Data Center in Santa Clara Builds Atop On-Grid Power for High-Density AI Delivery · BusinessWire
- ECL Plans 35MW Data Center in California That Will Use Some Hydrogen Power · Data Center Dynamics
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID ecl-csc1-santa-clara-ca. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.