This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- Cobalt Data Centers
- Address and locality
- 7710 W. Cheyenne Ave · Las Vegas · Clark County · Nevada · 89129
- Lifecycle status
- reported operational
- Facility type
- data center
- Reported capacity
- Operational: 5.5 MW (source-reported; boundary not independently verified)
- Source freshness
- 11 September 2026
- Location precision
- approximate
- Source confidence
- reported
- Stable directory ID
dcd-dir-000270
What the source record says
34,000 sq ft, Tier III-compliant, capacity for more than 450 cabinets, 9.0 MVA of generation and 4.5 MVA of UPS. Operator is recorded as Cobalt Data Centers - the entity that built and opened the site per the cited 2013 press report. dcmap.us currently attributes the facility to T5 Data Centers; that change of ownership could not be confirmed from a primary source this session, so it is flagged here rather than asserted.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2013-02-07 · reported operational
Ribbon-cutting reported by Data Center Knowledge; still listed as operational on dcmap.us in 2026.
Sources and attribution
- Cobalt Opens Cheyenne Data Center in Las Vegas - 34,000 sq ft, 5.5 MW of critical power · Data Center Knowledge
- Nevada data center directory - Cobalt Data Centers Cheyenne, 7710 W. Cheyenne, Las Vegas, NV 89129 · Cloud and Colocation
- dcmap.us Las Vegas market listing - Cobalt Cheyenne, operational · dcmap.us
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID cobalt-cheyenne-las-vegas-nv. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.