Licensed lead · not independently verified · dcd-dir-000252

CleanSpark Brazoria County (Second Texas) Campus

reported proposed

CleanSpark, Inc.

Brazoria County · Texas

Planned 300 MWSource updated 2 August 2026approximate location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
CleanSpark, Inc.
Address and locality
Brazoria County · Texas
Lifecycle status
reported proposed
Facility type
data center
Reported capacity
Planned: 300 MW (source-reported; boundary not independently verified)
Source freshness
2 August 2026
Location precision
approximate
Source confidence
reported
Stable directory ID
dcd-dir-000252

What the source record says

CleanSpark's second announced Houston-area AI/HPC campus (see also the separate Austin County campus, ~890 MW aggregate potential combined). No city or street address disclosed in any source found — coordinates are an approximate reference point at the Brazoria County seat (Angleton, TX), not a parcel location. 447 acres is disclosed as an 'up to' ceiling. An additional 300 MW (to a 600 MW total) is described as a potential future expansion, not yet ERCOT-approved or contracted. No named AI/HPC tenant or GPU lease disclosed for this specific site (unlike CleanSpark's Sandersville, GA site), so aiClassification is 'likely' rather than 'confirmed.' No raw SEC 8-K located this session for this transaction; sourced to CleanSpark's own press release and investor-relations pages, independently corroborated by trade press (DataCenterDynamics, The Energy Mag).

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-01-14 · reported proposed

    CleanSpark announced acquisition of up to 447 acres in Brazoria County with 300 MW (expandable to 600 MW) of ERCOT-approved interconnection capacity for a second Texas AI/HPC campus near Houston.

    Open cited source →

  2. 2026-02 · reported proposed

    CleanSpark's February 2026 operational update confirms the acquisition closed, adding '300 megawatts of ERCOT-approved capacity.' No construction-start evidence found; site remains staged as proposed.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID cleanspark-brazoria-county-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →