This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- CleanSpark, Inc.
- Address and locality
- Brazoria County · Texas
- Lifecycle status
- reported proposed
- Facility type
- data center
- Reported capacity
- Planned: 300 MW (source-reported; boundary not independently verified)
- Source freshness
- 2 August 2026
- Location precision
- approximate
- Source confidence
- reported
- Stable directory ID
dcd-dir-000252
What the source record says
CleanSpark's second announced Houston-area AI/HPC campus (see also the separate Austin County campus, ~890 MW aggregate potential combined). No city or street address disclosed in any source found — coordinates are an approximate reference point at the Brazoria County seat (Angleton, TX), not a parcel location. 447 acres is disclosed as an 'up to' ceiling. An additional 300 MW (to a 600 MW total) is described as a potential future expansion, not yet ERCOT-approved or contracted. No named AI/HPC tenant or GPU lease disclosed for this specific site (unlike CleanSpark's Sandersville, GA site), so aiClassification is 'likely' rather than 'confirmed.' No raw SEC 8-K located this session for this transaction; sourced to CleanSpark's own press release and investor-relations pages, independently corroborated by trade press (DataCenterDynamics, The Energy Mag).
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026-01-14 · reported proposed
CleanSpark announced acquisition of up to 447 acres in Brazoria County with 300 MW (expandable to 600 MW) of ERCOT-approved interconnection capacity for a second Texas AI/HPC campus near Houston.
- 2026-02 · reported proposed
CleanSpark's February 2026 operational update confirms the acquisition closed, adding '300 megawatts of ERCOT-approved capacity.' No construction-start evidence found; site remains staged as proposed.
Sources and attribution
- CleanSpark Expands Texas Footprint with Major Power Acquisition Near Houston · PR Newswire (CleanSpark, Inc.)
- CleanSpark Expands Texas Footprint (issuer IR copy) · CleanSpark, Inc.
- CleanSpark Releases February 2026 Operational Update · CleanSpark, Inc.
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID cleanspark-brazoria-county-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.