Applied Digital Polaris Forge 1

reported under construction

Applied Digital Corporation

Ellendale · Dickey County · North Dakota

Planned 400 MWOperational 100 MWSource updated 26 July 2026exact location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Applied Digital Corporation
Address and locality
Ellendale · Dickey County · North Dakota
Lifecycle status
reported under construction
Facility type
data center
Reported capacity
Operational: 100 MW; Planned: 400 MW (source-reported; boundary not independently verified)
Source freshness
26 July 2026
Location precision
exact
Source confidence
confirmed
Stable directory ID
dcd-dir-000085

What the source record says

Campus is 400 MW fully contracted to CoreWeave under ~15-year lease agreements valued at ~$11B total revenue. Three buildings: Building 1 (100 MW) complete Dec 2025; Building 2 (150 MW) expected mid-2026; Building 3 (150 MW) expected 2027. Coordinates are Ellendale city centroid; exact site is northeast of the city. Local jobs are reported only as projections — 'as many as 85 new jobs' (Dec 2024) and up to ~110 total local workforce at full expansion — not confirmed headcounts. No confirmed total campus capital-expenditure figure is public (the ~$11B CoreWeave figure is 15-year lease revenue, not capex); North Dakota's data-center sales-tax exemption applies but individual award amounts are statutorily confidential. investmentUsd reflects Applied Digital's own infrastructure spend (~$1.3B committed + ~$4B anticipated); the company's '$20B total campus' figure additionally counts ~$15B of customer/tenant capital.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2023 · reported under construction

    AI factory construction begins in Ellendale

  2. 2025-10 · reported operational

    Building 1 Phase 1 (50 MW) achieves Ready for Service for CoreWeave

    Open cited source →

  3. 2025-12 · reported under construction

    Building 1 fully operational at 100 MW; Buildings 2 (150 MW) and 3 (150 MW) under construction for CoreWeave

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID applied-digital-polaris-forge-1-ellendale-nd. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.