Licensed lead · not independently verified · dcd-dir-000083

Applied Digital Delta Forge 1 AI Factory Campus

reported under construction

Applied Digital Corporation

Boyce · Rapides County · Louisiana

Planned 300 MWSource updated 15 September 2026exact location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Applied Digital Corporation
Address and locality
Boyce · Rapides County · Louisiana
Lifecycle status
reported under construction
Facility type
data center
Reported capacity
Planned: 300 MW (source-reported; boundary not independently verified)
Source freshness
15 September 2026
Location precision
exact
Source confidence
confirmed
Stable directory ID
dcd-dir-000083

What the source record says

Anchor tenant is an undisclosed investment-grade U.S. hyperscaler under a $7.5B, 15-year lease. Two initial facilities totaling 300 MW across 300 acres (of 672-acre secured site). Initial operations targeted mid-2027. Applied Digital HQ in Dallas, TX.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-10 · reported proposed

    Applied Digital begins site development in Rapides Parish with location kept confidential; signed $7.5B, 15-year lease with undisclosed investment-grade U.S. hyperscaler for 300 MW.

    Open cited source →

  2. 2026-01 · reported under construction

    Site development begins January 2026. Location publicly revealed as Boyce, Rapides Parish in May 2026.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID applied-digital-delta-forge-1-la. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →