This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- 123NET
- Address and locality
- 400 76th Street SW · Byron Center · Kent County · Michigan
- Lifecycle status
- reported operational
- Facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 11 September 2026
- Location precision
- approximate
- Source confidence
- confirmed
- Stable directory ID
dcd-dir-000004
What the source record says
123NET's only west-Michigan site. The operator's own facility list (retrieved 2026-09-09) states 3,500 sq ft at 400 76th St SW, Byron Center. No per-facility MW figure published; cooling medium not stated. ⚠️ US Signal's MI02 facility page gives the identical street address, so this address appears to be a shared multi-operator building rather than a single-operator site; the two are proposed as separate operator records and a maintainer should confirm that reading. No investment, jobs, or incentive figures stated. Coordinates from the US Census geocoder; parcel not confirmed.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
No status history was supplied in this edition.
Sources and attribution
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID 123net-dc4-byron-center-mi. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.